Jason's Tube Bumper
Started with two 3' chunks of 2x6 1/4" wall tube steelone piece was cut in half for the angled sides that follow the body. 2" flat stock was used to cap the bottom and sides of the corners
1 1/2" angle was welded inside the frame at the top, and 2"x4" angle was welded on top of the frame. This was done to account for the 3" body lift, which doesn't look that great in this pic. hey Jason, i think you need some new bushings.
No comments:
Post a Comment